Western Regional Hospital

Second phase of Surveillance camera installation

Slide 1

Slide 4

Slide 2

Slide 2

1 2 3 4

Project information

  • Category: Technical
  • Client: Western Regional Hospital
  • Project date: November 9th-November 10th, 2019
    December 7th- December 8th, 2019

Western Regional Hospital, had no survellace camera at the time. The Regional Manager incharge was looking for a person to install the surveillance camera system for them. He contacted me and I gave him my proposal sicne they already had purchased the cameras. Afte the Hospital management and fince reviewed the proposal that was when i was given the green. The project was delived in two phases: phase one installation of the ethernet cable to the designated points for the surveillance camera to be installed. Second Phase was installation and configuration of the surveillance camera DVR.In total 16 surveillance cameras was installed in differnt key points for public and staff security.

© 2021  Designed by Sean Coleman
www.000webhost.com